SAP-Forum.ORG
   
This web site isn't affiliated with, sponsored by, or approved by SAP AG. Is only a SAP users community.

Go Back   SAP-Forum.ORG > SAP Forums > SAP MM - Material Management

Similar Threads
Thread Thread Starter Forum Replies Last Post
Activation Material Ledger and Currency type "10" of the Controlling area Zoom SAP FI CO - Financials and Controlling 0 11-26-2010 01:40 PM
Error "PROFILE_NOT_INITIALIZED" in ESS working-time Rampa SAP Portal 1 10-31-2010 10:20 PM
Exception condition "PROFILE_NOT_INITIALIZED" raised., error key: RFC_ERROR Pepa SAP Portal 3 10-31-2010 10:14 PM
R3trans table import returns "read only view" error Zoom SAP BASIS 2 08-17-2010 01:52 PM
Make "Reference Document" field as mandatory in Confirmation - by Siiva Kumar SAPSRM SAP SRM 0 07-12-2010 02:52 PM

Aprenda SAP!
Reply
 
Thread Tools Display Modes
  #1  
Old 01-31-2011, 11:30 PM
Rampa Rampa is offline
Senior Member
 
Join Date: May 2010
Location: Utah
Posts: 197
Default Stock Transfer Order (UB) with account assignment "CostCenter"

Hello,

I would like to know if it is possible to have a stock transfer order (UB) from Plant xxx1 to Plant xxx2 where in Plant xxx2, the transfer is account assigned to a Cost Center (for consumption).
I have material valuation a Plant level.

In the transfer of the stock, the accountmovement is from Existence to Consumer account (cost Center).
Basically: an UB (Posicion Type "V" but account assignment "K"!)

What I try to prevent is to have two steps:
1) stock transfer from stock Plant xxx1 to stock in plant xxx2
2) Consumption of stock (mvt 201) in plant xx2 to Cost Center.

Anybody did this before? How can it be done?

Thanks for any reply.
Rampa
Reply With Quote
Sponsors
  #2  
Old 01-31-2011, 11:31 PM
Golfi Golfi is offline
Senior Member
 
Join Date: May 2010
Location: Delaware
Posts: 824
Default Re: Stock Transfer Order (UB) with account assignment "CostCenter"

Hi,

System will allow to take the account assignment K cost center while creating the PO for UB type stock transfer .Once the supply plant deliver the material and PGIed the receiving plant should be able to poat a 101 for the PO so to get posted to consumption to the cost center in the PO.

Regards,
Golfi
Reply With Quote
Entre a los Links relacionados
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 07:56 AM.


Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Forum Design By inferno