![]() |
|
|||||||
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Activation Material Ledger and Currency type "10" of the Controlling area | Zoom | SAP FI CO - Financials and Controlling | 0 | 11-26-2010 01:40 PM |
| Error "PROFILE_NOT_INITIALIZED" in ESS working-time | Rampa | SAP Portal | 1 | 10-31-2010 10:20 PM |
| Exception condition "PROFILE_NOT_INITIALIZED" raised., error key: RFC_ERROR | Pepa | SAP Portal | 3 | 10-31-2010 10:14 PM |
| R3trans table import returns "read only view" error | Zoom | SAP BASIS | 2 | 08-17-2010 01:52 PM |
| Make "Reference Document" field as mandatory in Confirmation - by Siiva Kumar | SAPSRM | SAP SRM | 0 | 07-12-2010 02:52 PM |
| Aprenda SAP! |
|
|
![]() |
|
|
Thread Tools | Display Modes |
|
#1
|
|||
|
|||
|
Hello,
I would like to know if it is possible to have a stock transfer order (UB) from Plant xxx1 to Plant xxx2 where in Plant xxx2, the transfer is account assigned to a Cost Center (for consumption). I have material valuation a Plant level. In the transfer of the stock, the accountmovement is from Existence to Consumer account (cost Center). Basically: an UB (Posicion Type "V" but account assignment "K"!) What I try to prevent is to have two steps: 1) stock transfer from stock Plant xxx1 to stock in plant xxx2 2) Consumption of stock (mvt 201) in plant xx2 to Cost Center. Anybody did this before? How can it be done? Thanks for any reply. Rampa |
| Sponsors |
|
#2
|
|||
|
|||
|
Hi,
System will allow to take the account assignment K cost center while creating the PO for UB type stock transfer .Once the supply plant deliver the material and PGIed the receiving plant should be able to poat a 101 for the PO so to get posted to consumption to the cost center in the PO. Regards, Golfi |
| Entre a los Links relacionados |
![]() |
| Bookmarks |
| Thread Tools | |
| Display Modes | |
|
|