SAP-Forum.ORG
   
This web site isn't affiliated with, sponsored by, or approved by SAP AG. Is only a SAP users community.

Go Back   SAP-Forum.ORG > SAP Forums > SAP PP - Product Planning

Similar Threads
Thread Thread Starter Forum Replies Last Post
Error "No entry in table T551A" while creating set work schedule rule. Rima SAP HR 2 07-12-2011 10:02 PM
Crystal Reports 2008 "Invalid Class String" Error Mirna SAP Business Objects 1 03-22-2011 11:42 PM
Exception condition "PROFILE_NOT_INITIALIZED" raised., error key: RFC_ERROR Pepa SAP Portal 3 10-31-2010 10:14 PM
R3trans table import returns "read only view" error Zoom SAP BASIS 2 08-17-2010 01:52 PM
JOB Requirement for SAP ABAP for IBM, Kolkatta "Contract Position" Exp : 3+ yrs sapen SAP Job Offered 0 07-13-2010 10:13 AM

Aprenda SAP!
Reply
 
Thread Tools Display Modes
  #1  
Old 10-14-2011, 09:48 PM
Ramma Ramma is offline
Senior Member
 
Join Date: May 2010
Location: California
Posts: 287
Default "Capacity requirement is invalid" error during PLOD creatio

Hi Gurus,

When executing in PP/DS the Product Heuristic (SAP_PP_02) we get a popup with following Warning & Error entries:

W In-house production 1490313, source of supply 0000000000002118493000B001, product 211849, location 3000
W Resource W39000-K_3000_001, location 3000
E Capacity requirement is invalid *
E Order not created for product 211849 location 3000 date 31.01.2012 00:00:00 quantity 39.420 KG

(*): Message no. /SAPAPO/OM601

Impacted work-center is modelled in ECC as a subcontracted operation, its assigned control key is flagged to Determine capacity requirements. Resource in APO is multimixed with a reference resource capacity, its Capacity variant & profile looks both OK.

Thanks for any valuable feedabcks.

Regards,
Ramma
Reply With Quote
Sponsors
  #2  
Old 10-14-2011, 09:49 PM
Ramma Ramma is offline
Senior Member
 
Join Date: May 2010
Location: California
Posts: 287
Default Re: "Capacity requirement is invalid" error during PLOD creatio

Hi again,

The root-cause was a engineering issue with an invalid operation control key used in the material routing:

I sucessfully switched from a CK with
- Scheduling
- Det. Cap. Reqmnts
- Cost
- Print confirmations
- Print time tickets
- Print

to a new one with:
- Scheduling
- Det. Cap. Reqmnts

Regards,
Ramma
Reply With Quote
  #3  
Old 10-14-2011, 09:51 PM
Golfi Golfi is offline
Senior Member
 
Join Date: May 2010
Location: Delaware
Posts: 824
Default Re: "Capacity requirement is invalid" error during PLOD creatio

Hi Ramma,

Did you go through the long text of the error message that is raised during order creation? It gives many hints as to what could be the cause:

Bucket capacity requirement has an invalid value
Message no. /SAPAPO/OM610

Diagnosis
You want to create or change an order. A bucket capacity requirement of
the order has an invalid value. The following bucket capacity
requirements are invalid and lead to errors:

A bucket capacity requirement with the value 0 for a bucket resource
A negative bucket capacity requirement for an SNP activity
A bucket capacity requirement that is not equal to zero for a setup
activity
A bucket capacity requirement that is not equal to zero for a resource
that is not a bucket resource
A bucket capacity requirement that is not equal to zero if the activity
duration is zero
A negative value if the activity duration is different to zero
System Response
The system cannot create or change the order.

Procedure
Check the source of supply (for example, the production process model)
with which the order is to be created or changed.

Regards,
Golfi
Reply With Quote
Entre a los Links relacionados
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 08:55 AM.


Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Forum Design By inferno